Bachelor Enlisted Quarters, Bid Package #5

Camp Pendleton, San Diego, CA

Construction was completed on the Bachelor’s Enlisted Quarters (BEQ) Bid Pack # 5 project in 2012.
The design-build project consisted of three BEQ campuses located in Del Mar 21 Area, Headquarters
14 Area, and Chappo 22 Area. In total, 5 BEQ buildings, 5 recreational facilities, numerous amenities,
and the associated improvements were constructed across the 3 sites.

Hale Engineering provided civil engineering and surveying services including topographic surveys
and base mapping, grading plans, street, surface and utility improvement plans, demolition plans,
horizontal control plans, erosion control plans, retaining wall profiles, terrain modeling and earthwork
calculations, quantity estimates, hydrologic/hydraulic calculations, storm water retention design,
and drainage report, project processing and coordination, specifications, LEED documentation,
construction staking and layout, construction observation, Water Pollution Quality Technical Report
(WQTR), Storm Water Pollution Prevention Plan (SWPPP) and record drawings.

Bachelor Enlisted Quarters, Bid Package #5

Recruit Barracks, School of Infantry

Camp Pendleton, San Diego, CA

Construction was completed on the School of Infantry in 2013. The design-build project, on MCB Camp
Pendleton, consisted of a 4 story building, a 3 story parking structure, water reservoir improvements,
and a solar field. This is a LEED Gold project with sustainable architectural and energy efficient features,
storm water sustainability, an array of concentrated photovoltaic sun tracking solar power, geothermal
well field heating and cooling, and other state of the art design features.

Hale Engineering provided civil engineering and surveying services including topographic surveys and
base mapping, grading plans, surface and utility improvement plans, demolition plans, horizontal control
plans, erosion control plans, retaining wall profiles, terrain modeling and earthwork calculations, quantity
estimates, hydrologic/hydraulic calculations, storm water retention design, and drainage report, project
processing and coordination, specifications, LEED documentation, construction observation, Water
Quality Technical Report (WQTR), Storm Water Pollution Prevention Plan (SWPPP) and record drawings.

Recruit Barracks, School of Infantry

Child Development Center P-601

Camp Pendleton, San Diego, CA

Construction was completed on the De Luz Child Development Center (CDC) P-601 in 2011. The
design-build project, located in Headquarters 12 Area, included a preschool building constructed
around a central piazza , 4 playgrounds, and numerous educational amenities. The preschool
employs a Reggio Emilia based curriculum. This approach considers the environment to be the
“third teacher”. A top priority throughout the project design was to plan a stimulating learning
environment in accordance with the Reggio Emilia philosophy.

Hale Engineering provided civil engineering and surveying services including topographic surveys
and base mapping, grading plans, street, surface and utility improvement plans, demolition plans,
horizontal control plans, erosion control plans, retaining wall profiles, terrain modeling and earthwork
calculations, quantity estimates, hydrologic/hydraulic calculations, storm water retention design, and
drainage report, project processing and coordination, specifications, LEED documentation, construction
staking and layout, construction observation, Water Pollution Quality Technical Report (WQTR),
Storm Water Pollution Prevention Plan (SWPPP) and record drawings.

Child Development Center P-601

Aircraft Maintenance Hangers P-545
North & South

MCAS, Yuma, AZ

The P-545 Aircraft Maintenance Hangers are located on the Marine Corps Air Station (MCAS) Yuma,
in Yuma, Arizona. P-545 is a design-build project consisting of two Joint Strike Fighter (JSF) compliant
aircraft maintenance hangars, along with aircraft parking aprons, taxiways, privately owned vehicle (POV)
parking lot, and associated infrastructure. The Hangers are scheduled for delivery this year.

Our services included consultation, design for surface improvements, street improvements, utility
improvements, grading design, terrain modeling, earthwork calculations, hydrologic & hydraulic calculations,
quantity and cost estimation, specifications preparation, storm water retention design, topographic surveys
and base mapping, hydrology reports, plan processing, and construction coordination.

Aircraft Maintenance Hangers P-545